LXRP - Union Mont Albert

Client: Level Crossing Removal Project

Value Managed: $15M

Location: Union Mont Albert

Date Completed: 2023

 

Scope of Works

  • Stormwater tank installation

  • Drainage installation over four metres deep within constrained streets

  • Drainage works completed along entire south alignment of level crossing

  • Piling pad installation

​

Project Overview

This project included deep drainage installation and stormwater infrastructure as part of the Union Mont Albert precinct works. All drainage was delivered within constrained urban streets and under strict time and safety requirements.

​

Quick Facts

Duration: 2022–2023
Role: Drainage and Infrastructure Management
Team: 20+ subcontractors

Bulk Excavation - UMA.jpg
Stirling Cres - Drainage.jpg
Piling Pads - Beresford.jpg
Karm Solutions _Civil Construction Melbourne

Quick Links

Connect With Us

Braybrook, VIC 3019

0402 515 732

info@karmsolutions.com.au

ABN: 75 187 050 076​
 

  • Instagram
  • Facebook
  • LinkedIn

KARM Solutions PTY LTD.

Aboriginal_Logo_Karm_Solutions_Proud_Aboriginal_Supporting_Business
Torres_Strait_Islander_Commercial_Management

We acknowledge the Traditional Owners of the land on which we gather today, the Wurundjeri Woi Wurrung people of the Kulin Nation. We pay our respects to their Elders past and present and recognise their enduring connection to land, waters, and community.

© 2025 KARM Solutions PTY LTD. All rights reserved.

bottom of page