top of page
LXRP - Union Mont Albert
Client: Level Crossing Removal Project
Value Managed: $15M
Location: Union Mont Albert
Date Completed: 2023
Scope of Works
-
Stormwater tank installation
-
Drainage installation over four metres deep within constrained streets
-
Drainage works completed along entire south alignment of level crossing
-
Piling pad installation
​
Project Overview
This project included deep drainage installation and stormwater infrastructure as part of the Union Mont Albert precinct works. All drainage was delivered within constrained urban streets and under strict time and safety requirements.
​
Quick Facts
Duration: 2022–2023
Role: Drainage and Infrastructure Management
Team: 20+ subcontractors



Ringwood East
Swanson Dock West – Berth 1